The ultimate checklist

Comprehensive office fit-out checklist, essential for implementing practical and aesthetic office design ideas.

Considering a relocation or refurbishment? Our comprehensive Office Fitout Checklist covers every step of the process! From defining your needs and design considerations to delivering the fitout and post-move steps, discover the essential elements of an office fitout and ensure a smooth transition for your business. Letโ€™s dive in!

Stage 1: Define your needs

Step 1: Questions to ask yourself before deciding to relocate or refurbish:

  • Why do you need a new space?
  • What sort of fitout do you need?
  • Where are you located or planning to move?
  • When do you want to undergo this project?
  • Who needs to get involved in the project?
  • How much are you budgeting to spend? Check out our space & budget calculator.
  • What legal obligations, permits, and responsibilities do you need to consider?
  • Are you going with a Design and Construct company or a Traditional method?

Step 2: Compile a brief for your Office Fitout Specialist. Provide any information you think is necessary, including the following:

  • How many staff members do you have currently and are you planning to grow?
  • How many square metres will you need, considering the above question?
  • Are you refurbishing or relocating?
  • What is the businessโ€™s location?
  • What is your budget and timeline?
  • What level of finish are you expecting?
  • Who is your target market? What would be inviting to your ideal client?
  • What is your current branding?

Step 3: Get in touch with an office fitout company:

  • Give them your brief and email through your base build plans.
  • Organise a face-to-face visit, they may have ideas on creative ways to use your space!

Stage 2: Delivery

During the delivery stage, your fitout specialist will keep you informed about the progress, milestones, and any issues that may arise.

Step 1: Site Preparation:

  • The project team will set up the necessary infrastructure, such as site facilities.
  • Materials and equipment are delivered to the site.
  • Demolition and Removal, if existing structures are in place.
  • The site is cleaned of debris and prepared for construction.

Step 2: Construction:

  • Structural modifications are made if needed, to accommodate new design, such as adding or removing walls or creating new openings.
  • Mechanical, electrical, and plumbing installations.
  • Flooring, ceiling, and wall installations are made as per design.
  • Partitioning, cabinetry, and other built-in elements are installed.
  • Fixtures and fittings are installed.
  • Painting and finishing are applied to walls, ceilings, and other surfaces.
  • Furniture Installation, placement, and assembly of furniture unless using current furniture.

Step 3: Testing and Commissioning:

  • System testing of electrical, mechanical, plumbing, and other systems to ensure they are functioning properly.
  • Inspections and quality checks to ensure fitout meets all required standards and specifications.
  • Identifying and rectifying any defects, issues, or incomplete work discovered during inspections.

Step 4: Handover and Completion:

  • Walkthrough with the project manager for a final inspection.
  • Any remaining defects and issues are addressed and rectified promptly.
  • Final Clean.
  • Documentation and Handover from fitout specialist including all relevant documentation such as manuals, warranties, and as-built drawings.

Stage 3: The Move

Preparing for the move requires careful consideration and organisation. Think about aspects like cleaning, access cards, furniture requirements, etc. Create a checklist, communicate with the necessary parties, and plan the logistics. On moving day, coordinate with a moving company, disassemble and pack items as needed, and ensure a smooth transition.

Things to consider:

  • Do you need to organise a final clean before and after you move in?
  • Will you need to order keys or access cards for your employees?
  • Is your Internet, Wi-Fi, and phone installation up to the standard you need?
  • Do you need to organise Computer and IT system set-up?
  • Do you have all the Insurance and permits you need?
  • Are you taking the old office furniture and equipment with you or arranging replacements?
  • Do you need to organise a Grand Opening?

Before the move:

  • Organise a moving company.
  • Figure out what office items are going to be taken in the move and what needs replacing.
  • List all items that need to be disassembled.
  • Provide a layout and floor plan which shows where everything will go.
  • Announce to the public that youโ€™re moving.
  • Change your billing and delivery address.
  • Prepare everything for the moving company.

Stage 4: Post Move

Donโ€™t forget post-move tasks and evaluate the overall experience with your fitout specialist.

  • Post-completion support is provided by your fitout specialist, make sure to follow up with any questions.
  • Complete a post-move evaluation of overall performance, quality of work, and customer service provided by the contractors and project team to help improve the fitout specialistโ€™s future projects.

Ready to create an inspiring work environment?

Embarking on an office fitout journey is an exciting opportunity to transform your workspace into a functional, aesthetically pleasing environment that aligns with your companyโ€™s vision. By following the steps outlined in this checklist, you can ensure a smooth and successful office fitout process. Remember, the right office fitout can enhance productivity, boost employee morale, and create a lasting impression on clients and visitors.