office fitout melboune.

01

Contract, covering design
and build together

6-12

Typical weeks on site
for a full fitout

25+

Years fitting out
Australian Workplaces

100%

Permits and compliance
handled in-house

WHY DESIGN & BUILD

One contract removes the risk you’d otherwise carry

Split a fitout between a designer, a builder and a furniture supplier and every gap between them becomes your problem, variations, blame, and a project nobody owns. Integrated delivery closes those gaps before they open. The people who drew it are the people who build it.

01

Buildability from day one

Our construction managers sit in the design reviews, so what gets drawn can actually be built to budget โ€” no redesign loop after the first price comes back.

02

Progressive budgeting

Costs build up as the design resolves, with staged approval gates. You can trim, phase or add scope with real numbers in front of you instead of guessing.

03

One point of contact

Furniture lead times, services rough-in and base-building approvals are sequenced together from the start, which is where most fitout delays actually come from.

04

One accountability

If something needs fixing, there is no argument about whose scope it was. Your project manager owns the answer and the remedy.

SCOPE

What a full office fitout includes

01

Planning, documentation
& approvals

Test fits against your headcount and work styles, then the full documentation set a builder and a certifier both need. We lodge the permits and manage landlord approvals so the site start date holds.

  • Test fits and stacking plans
  • Construction documentation
  • Building permits and certification
  • Landlord and owners corporation approvals
02

Construction & base works

Demolition, partitioning, glazed fronts, ceilings, doors and hardware, painting and floor coverings โ€” set out precisely and finished to a standard that still reads as new after five years of use.

  • Demolition and make-safe
  • Partitions, glazing and acoustic treatment
  • Ceilings, doors and hardware
  • Flooring, paint and wall finishes
03

Services, data & technology

Power and data where people actually sit, lighting designed for screens rather than showrooms, and the AV and connectivity that makes hybrid meetings work instead of merely happen.

  • Electrical, power and data cabling
  • Lighting design and controls
  • Meeting room AV provisioning
  • Mechanical adjustments and essential services
04

Joinery, furniture & handover

Custom reception and utility joinery, then workstations, seating, storage and accessories specified, delivered and installed to the plan, followed by a proper defect walk and the compliance documentation your insurer will ask for.

  • Custom joinery and reception
  • Workstations, seating and storage
  • Signage, planting and accessories
  • Defect management and O&M documentation

working flow

how we do things

Our integrated, end to end design and delivery approach ensures a smooth experience throughout the project journey. Through collaboration, we pay attention to the finer details without losing sight of your overarching vision and objectives. Our track record of satisfied clients and projects delivered on time and budget is a testament to the way we work.

client testimonial

“The process was seamless, and Tim is extremely knowledgeable and understanding of what we needed and to a tight timeframe. Also, a massive shout out to Brad the project manager who was amazing and went above and beyond , he is a pleasure to work with and extremely knowledgeable in the construction process. Thanks so much for the amazing office fit out , hope to work with you in the futureโ€

Leigh Wilkins

Medpace

office fitouts, answered

Yes โ€” cold shell, warm shell or an existing fitout to be stripped. We assess base-building services early, because that is where shell projects usually gain or lose four weeks.

Six to sixteen weeks on site for most commercial floors, driven by area, base-building condition and services scope. Design and permits typically add four to eight weeks ahead of that. You get a firm programme at the end of Define.

Often, yes. If capital is phased across financial years we design the whole floor once and build it in defined stages, so the later work doesn’t undo the earlier work..

It moves with finish level, meeting-room density and how much services work the tenancy needs โ€” which is why we price progressively rather than quoting a rate blind. You will have a realistic envelope before design starts.

We do. Fitout applications, building manager inductions, access and loading dock bookings, and works notices are all part of the contract. We have long-standing relationships with agents and building managers across Victoria.

A defect period, full O&M and compliance documentation, and an ongoing relationship for maintenance, churn moves and reconfigurations as your headcount changes.

We service Melbourne, Geelong, Ballarat, Bendigo and all of Regional Victoria.

related services

Space planning, concept design, finishes and 3D visualisation โ€” the design stage on its own, or as the front end of a fitout.

Upgrading a floor you already occupy, staged around your operating hours to keep the business running.

Workplaces with impact

Remarkable results

Exceptional experience

Let’s talk

let’s work wonders

Send us the floor plan, your headcount and your target occupancy date. We’ll come back with straight answers on scope, timeline and budget โ€” no obligation.